When a job moves to Production in the Pipeline it appears in the Production work queue. From there your crew works through seven steps.

The seven steps

Step Name What happens
1 Verification Check line items, customer details, and colours before cutting anything
2 Material Pull Confirm sheet and coil availability and pull stock
3 Cutting Shear flat sheets to the cut-list dimensions
4 Bending Fold trims and flashings on the brake press
5 NTM Prep Load coil and configure the roll-forming machine
6 QC / Run Run panels to length and inspect for defects
7 Ready Package, label, and stage for delivery or pickup

Completing step 7 moves the job to In Route in the Pipeline automatically.

Timer

A running clock tracks total production time per job, accumulating across sessions so you know actual shop time for job costing.

Crew assignment

Assign a crew member to each job from your staff list. The system records who completed each step.

Visual cut-list

The cut-list shows each trim piece, its dimensions, and its sheet assignment — including the nesting layout so the crew can see at a glance which pieces come from which sheet.